Field Activities for the Conservation and Sustainable Development of Ta Nei Temple in Angkor, Cambodia (Part XII) – Status of Recording and Surveying Conducted for the Report on Restoration on the East Gate

The East Gate after completion (photo taken by drone)

 The Tokyo National Research Institute for Cultural Properties (TOBUNKEN) continues to support the conservation and sustainable development project of Ta Nei Temple by the Authority for the Protection and Management of Angkor and the Region of Siem Reap (APSARA) in Cambodia. In November 2022, the two parties completed a three-year collaborative restoration project to dismantle and restore the East Gate of the temple. From May 6 to 18, 2023, TOBUNKEN dispatched our group, consisting of two staff members, to the site to record the completion status of the restoration and conduct additional research for the preparation of a final report on the restoration work to be published this year. 
 For documentation of the completion status, in addition to (1) architectural photography, (2) architectural drawings and (3) a digital 3D model of the East Gate were created. The digital 3D model with dimensional information was generated from some 1,000 images of the building taken from all directions with a single-lens reflex camera and two drones (Mavic mini), using a technique known as “3D photogrammetry.”
 Supplementary survey work for preparing the final report included (1) partial revision of the temple layout drawings, (2) photographic documentation of pediment decorations, and (3) a comparative study to analyze the architectural features of the East Gate. For the comparative survey, we visited 10 other temples among the Angkor Monuments that were constructed during the same period as Ta Nei Temple to examine their architectural styles and decorations. 
 In addition, on-site discussions were held with APSARA representatives regarding the future implementation plan of the Ta Nei Temple conservation project. 
 We plan to conduct archaeological excavation and architectural survey of the Entrance Terrace to the Causeway, publish a final report, and organize a symposium to commemorate the completion of the East Gate restoration work in the second half of this fiscal year. We will keep you posted on the progress of our project!
 Please also see the past activity reports on the Ta Nei project.

Field Activities (Part I)
Field Activities (Part II)
Field Activities (Part III)
Field Activities (Part IV)
Field Activities (Part V)
Field Activities (Part VI)
Field Activities (Part VII)
Field Activities (Part VIII)
Activities during the COVID-19
Field Activities (Part IX)
Field Activities (Part X-1)
Field Activities (Part X-2)
Field Activities (Part X-3)
Field Activities (Part XI)

to page top